I Stockholm fortskrider också bygget. En annan metod, med att montera allt nere i båten utan däck först, än vad Jörgen Jensen gör som redan har däcket på.
Snart blir det locket på i Stockholm och då är det frågan vem som leder i sjösättningsracet.
Now we are almost finished with the interior and equipment below deck. There are not so many days before we ”close the lid”. A lot of gear is much easier to install and get in place, before the deck is put on. I.e. self drainers and blocks for the trim. Of course there is also a lot of fairing and sanding before the topcoat is put on. The other day the boat also was mesaured buy Håkan Kellner, inspector from the 5,5 association. Everything seemed to be to his satisfaction.
Snart blir det locket på i Stockholm och då är det frågan vem som leder i sjösättningsracet.
Now we are almost finished with the interior and equipment below deck. There are not so many days before we ”close the lid”. A lot of gear is much easier to install and get in place, before the deck is put on. I.e. self drainers and blocks for the trim. Of course there is also a lot of fairing and sanding before the topcoat is put on. The other day the boat also was mesaured buy Håkan Kellner, inspector from the 5,5 association. Everything seemed to be to his satisfaction.
Självlänsarna är på
Inga kommentarer:
Skicka en kommentar